Ekera Medical Centre

116-118 Thames Street Box Hill

Project Delivered By Paul Entwistle Director At Dzine Construction Group

Screen Shot 2018-11-09 at 4.13.34 pm.png
 

Project Description 

The project consisted of 3 levels of basement car parking piling and shotcrete. Ground floor retails cafe and embrace receptions. Post-tensioning construction with curtain wall and 3 levels of medical consulting suites.

Project Delivery

  • 3 level basement carpark

  • Ground floor retail fit out

  • 3 levels of medical suites build and 
    fit out